WHAT'S NEW
POSTINGAN SELANJUTNYA: RUMUS MENGHITUNG LUAS PERMUKAAN DAN VOLUME BANGUN RUANG (BAGIAN 2)

d

Well Planning - Blogspot

Well Planning (Minimum Curvature) — Blogspot

1) Sistem Koordinat & Surface







2) Masukkan Survey (MD, Inc(deg), Azi(deg))

Format: MD (m), Inc (deg), Azi (deg). Satu baris = satu survey. Contoh:

3) Perhitungan / Parameter


Metode perhitungan: Minimum Curvature (standar survey drift).

Peta

Tabel Posisi Well

Visualisasi 3D (MD - TVD - Northing/Easting)



0 komentar:

Posting Komentar