POSTINGAN SELANJUTNYA: RUMUS MENGHITUNG LUAS PERMUKAAN DAN VOLUME BANGUN RUANG (BAGIAN 2)
cob (validation)
Advanced LAS Viewer & Splicer
Advanced LAS Viewer & Splicer (Classification-Based)
Drag and Drop LAS files here
0%
KNOWING YOUR POSITION IN TVD (VALIDATION-TUESDAY)
Survey Deviasi Sumur - 2D & 3D
YOUR WORKSPACE
Attention: Use the input format according to the placeholder. Units: MD (m), INCL (°), AZI (°), Easting (m), Northing (m), Surface elevation (m), Azimuth Vertical Section (°). Copy paste from your Excel.
Input Data Survey
Format: MD,INC,AZI (Copy and paste from your Excel sheet)
Initial Coordinates (of Surface Location)
Easting (X) [m]:
Northing (Y) [m]:
Surface elevation (Z above ground) [m]:
Azimuth Vertical Section (VS Azimuth): °
2D View: Vertical Section vs TVD
3D View: Easting, Northing, Elevation
Input the Point You Want to Change from MD to TVD
Format: MD,Explanation (Copy and paste from your Excel sheet)
Palynspathic Reconstruction Trial
Palinspastik Strain Calculator
Palinspastik Strain Calculator
Upload gambar dan klik dua titik untuk menghitung strain.
Table to Excel
Drag & Drop Mudlog Image
Drop or click to upload
Sedlog
SedLog Generator
Masukkan data CSV (Top, Base, Lithology, Color, Struktur, Ketebalan):
d
Well Planning - Blogspot
Well Planning (Minimum Curvature) — Blogspot
1) Sistem Koordinat & Surface
2) Masukkan Survey (MD, Inc(deg), Azi(deg))
Format: MD (m), Inc (deg), Azi (deg). Satu baris = satu survey. Contoh:
3) Perhitungan / Parameter
Metode perhitungan: Minimum Curvature (standar survey drift).